This guide covers complete Hub installation from valve assembly through panel mounting. Follow these steps to set up centralized vacuum control for your SYS-GRP workholding system.
| Phase | Do this | Pass check |
|---|---|---|
| Valve setup | Configure ports (R source, A endpoint, P plugged) + assemble fittings | Leak test passes with A capped |
| Release setup | Install release upstream; ensure P is open to atmosphere | Fast bleed-down on release |
| Panel assembly | Join panels with dovetails + wings | Panels flush, hardware tight |
| Panel mounting | Mount to MFT/3, Dashboard PWS, or extrusion method | Stable mount, clearance OK |
| Vacuum routing | Route, secure, and label lines | No snag points, labels make sense |
| System leak testing | Test each line + isolation + release | Each zone holds, release dumps cleanly |
| Category | Checklist |
|---|---|
| What you’ll need | Release valve and plunger cut-off valves (see: Quick Bill of Materials) |
| 1/4” NPT Plug (see: Quick Bill of Materials) | |
| Hub panel components (release and valve panels) | |
| M5 or M6 fasteners (depending on mounting surface) | |
| M5 or M6 rail inserts (depending on mounting surface) | |
| Allen keys (ball-headed recommended for tight spaces) | |
| Thread sealant (Teflon tape or appropriate paste for valve threads) | |
| Compatibility check | Confirm your bench system: MFT/3, Dashboard PWS, or extrusion profiles |
| Verify tubing size matches your vacuum source and endpoints | |
| Check clearance near dog holes and rail channels |
Route and label once, then forget it. For the standard valve, ports behave as follows:
